Ridgeview Development

Ridgeview Development

  • T&M General Contractors was one of the first contractors in the Reedsburg area to use Expanded Polystyrene as a concrete forming system.
  • Foam panels used as concrete forms are designed to be left in place resulting in very energy efficient wall system (R-25).
  • The Elderly Retirement Project shown here utilizes full 8" concrete wall thickness plus 2-1/2" of foam insulation each side.
  • Wall thickness' up to 12" and 12' high can be accomplished in a single pour. Our company is currently constructing two more foundations and will add more information to our website.

To Find out more information on Insulated Concrete Forms contact us.

 

 
home page
 
About us | Pre-Engineered Metal Buildings | Utility Buildings | Architectural Metal
Concrete
| Insulated Concrete Walls | Crane Service | Request More Info | Links